Cost to Manage Remodeling Work

Updated: January 2015

Remodeling Management Cost CalculatorZip Code
Managements
ItemQuantityLow  High  
Remodeling Management Labor
Direct labor expenses to manage remodeling work. Includes planning, job equipment and material acquisition, area preparation, setup and cleanup.
55.4 hours$2,911.75$3,729.05

Totals - Cost to Manage Remodeling Work - 1 Management $2,911.75$3,729.05
Average Cost Per Management  $2,911.75$3,729.05

Looking for a fast, accurate estimate of the cost to Manage Remodeling Work? This FREE online calculator uses the latest material costs, unit productivity rates and region specific wages to create instant, no-obligation estimates for your Remodeling Management project. For a basic 1 management project in zip code 47474, the cost to Manage Remodeling Work averages $2,911.75 - $3,729.05 per management - but costs in your area will vary. To estimate costs for your project:

1. Set Project Location Enter the location is where labor is hired and materials purchased.

2. Specify Project Size Enter the number of "items" required for the project.

3. Re-calculate Click the "Update" button.


Share

Cost to Manage Remodeling Work - Notes and General Information

Homewyse cost estimates are "ballpark" ranges for basic work performed in normal, serviceable conditions. The estimates should only be used for preliminary planning. Homewyse estimates are NOT substitutes for firm quotes from qualified vendors. Homewyse strongly recommends that you contact reputable professionals for an accurate assessment of work required and costs for your project - before making any decisions or commitments.

The cost estimate includes:

  • Costs for local material / equipment delivery to and service provider transportation to and from the job site.
  • Costs to prepare the worksite for Remodeling Management, including costs to protect existing structure(s), finishes, materials and components.
  • Costs for job cleanup and debris removal at project completion.
  • Labor setup time, mobilization time and minimum hourly charges that are commonly included for small Remodeling Management jobs.

The cost estimate does not include:

  • Unless explicitly noted in the description of work, this Remodeling Management estimate does NOT include costs for relocating, repairing, modifying or enhancing existing structural, HVAC, electrical, ventilation and plumbing systems - or bringing those systems into compliance with current building codes.
  • General contractor overhead and markup for organizing and supervising the Remodeling Management. Add 11% to 19% to the total cost above if a general contractor will supervise this project.
  • Sales tax on materials and supplies.
  • Permit or inspection fees (or portion thereof) required by your local building department for your overall project.

Cost to Manage Remodeling Work - References


Remodeling Management - Average Cost Per Management

Expect to pay in the high end of the estimated price range for a licensed, bonded and insured contractor and for complex or rush projects. Hire carefully, only after verifying prior work quality.

For the best value on Remodeling Management: combine related projects; get bids from several pros; and be flexible about project scheduling.


Help the homewyse Community

We're a cooperative community that values and depends on your input. So, let us know - how can we improve this site? Would your friends and online contacts benefit from homewyse information? Make homewyse better for everyone - send your feedback or share this page. Many thanks!

  • Send your feedback or questions.
  • Share homewyse on Facebook, Twitter or Google+ using the buttons below: