Updated: January 2013
| Item | Quantity | Low | High |
| Pool Labor Direct labor expenses to remove pool. | 3.0 hours | $106.50 | $159.75 |
| Pool Debris Disposal Costs Costs to load and haul away old materials and installation waste. | $20.00 | $25.00 | |
| Pool Equipment Allowance Job related costs of specialty equipment used for job quality and efficiency, including: skid loader with excavation | demolition | loading attachment.. | $161.25 | $228.75 | |
| Totals - Cost to Remove Pool | 1 cubic yards | $287.75 | $413.50 |
| | Average cost per cubic yard | $287.75 | $413.50 |
The cost to Remove a Pool averages $287.75 - $413.50 per cubic yard in 2013. This Pool Removal and Backfilling cost estimate is calculated from average material costs, unit labor producitivity rates and national average hourly labor wages. To refine the estimate for your Pool Removal and Backfilling project:
1. Set Project Location Enter the location is where labor is hired and materials purchased.
2. Specify Project Size Enter the number of "cubic yards" required for the project.
3. Re-calculate Click the "Update" button.
Expect to pay in the high end of the $287.75 - $413.50 per cubic yard range for a licensed, bonded and insured contractor and for complex or rush projects. Hire carefully, only after verifying prior work quality.
For the best value on Pool Removal and Backfilling: combine related projects; get bids from several pros; and be flexible about project scheduling.
The cost estimate includes:
The cost estimate does not include: