| Item | Quantity | Low | High |
| Slab Labor Direct labor expenses to remove concrete slab. | 10.3 hours | $523.21 | $557.61 |
| Slab Debris Disposal Costs Costs to load and haul away old materials and installation waste. | $94.50 | $104.50 | |
| Slab Equipment Allowance Job related costs of specialty equipment used for job quality and efficiency, including: 115v, 15 amp electric jack hammer, 1000+ blows/minute. | $48.75 | $70.50 | |
| Totals - Cost to Remove Concrete Slab | 100 square feet | $666.46 | $732.61 |
| | Average cost per square foot | $6.66 | $7.33 |
The cost to Remove a Concrete Slab averages $6.66 - $7.33 per square foot in 2013. This Concrete Slab Removal cost estimate is calculated from average material costs, unit labor producitivity rates and national average hourly labor wages. To refine the estimate for your Concrete Slab Removal project:
1. Set Project Location Enter the location is where labor is hired and materials purchased.
2. Specify Project Size Enter the number of "square feet" required for the project.
3. Re-calculate Click the "Update" button.
Expect to pay in the high end of the $6.66 - $7.33 per square foot range for a licensed, bonded and insured contractor and for complex or rush projects. Hire carefully, only after verifying prior work quality.
For the best value on Concrete Slab Removal: combine related projects; get bids from several pros; and be flexible about project scheduling.