Updated: January 2013
| Item | Quantity | Low | High |
| Polished Cost Non-discounted retail cost for common, mid-grade polished. Quantity includes typical installation waste, fabrication overage, material for future repairs and delivery within 25 miles | 214 square feet | $534.72 | $636.52 |
| Polished Labor Direct labor expenses to polish concrete. | 3.7 hours | $192.36 | $201.06 |
| Polished Job Materials and Supplies Cost of supplies that may be required to polish concrete including: reinforcing materials, isolation materials, cleaning and chemical release agents . | 200 square feet | $9.66 | $25.00 |
| Polished Equipment Allowance Job related costs of specialty equipment used for job quality and efficiency, including: 20" polishing and grinding machine, with production rates of 200 - 450 square feet per hour. | $138.00 | $168.75 | |
| Totals - Cost to Polish Concrete | 200 square feet | $874.74 | $1,031.33 |
| | Average cost per square foot | $4.37 | $5.16 |
The cost to Polish Concrete averages $4.37 - $5.16 per square foot in 2013. This Concrete Polishing cost estimate is calculated from average material costs, unit labor producitivity rates and national average hourly labor wages. To refine the estimate for your Concrete Polishing project:
1. Set Project Location Enter the location is where labor is hired and materials purchased.
2. Specify Project Size Enter the number of "square feet" required for the project.
3. Re-calculate Click the "Update" button.
Expect to pay in the high end of the $4.37 - $5.16 per square foot range for a licensed, bonded and insured contractor and for complex or rush projects. Hire carefully, only after verifying prior work quality.
For the best value on Concrete Polishing: combine related projects; get bids from several pros; and be flexible about project scheduling.
The cost estimate includes:
The cost estimate does not include: