Updated: January 2013
| Item | Quantity | Low | High |
| Water Line Labor Direct labor expenses to move water line. | 3.8 hours | $192.64 | $208.54 |
| Water Line Job Materials and Supplies Cost of supplies that may be required to move water line including: fittings, mounting hardware and connectors. | 1 line | $81.40 | $88.15 |
| Water Line Equipment Allowance Job related costs of specialty equipment used for job quality and efficiency, including: pipe cutting and threading, tubing cutter, brazing kit and pipe wrenches.. | $24.00 | $48.75 | |
| Totals - Cost to Move Water Line | 1 line | $298.04 | $345.44 |
| | Average cost per line | $298.04 | $345.44 |
The cost to Move a Water Line averages $298.04 - $345.44 per line in 2013. This Water Line Re-Routing cost estimate is calculated from average material costs, unit labor producitivity rates and national average hourly labor wages. To refine the estimate for your Water Line Re-Routing project:
1. Set Project Location Enter the location is where labor is hired and materials purchased.
2. Specify Project Size Enter the number of "items" required for the project.
3. Re-calculate Click the "Update" button.
Expect to pay in the high end of the $298.04 - $345.44 per line range for a licensed, bonded and insured contractor and for complex or rush projects. Hire carefully, only after verifying prior work quality.
For the best value on Water Line Re-Routing: combine related projects; get bids from several pros; and be flexible about project scheduling.
The cost estimate includes:
The cost estimate does not include: