Home Service Job Cost Calculator
   

Cost to Backfill a Trench

Updated: January 2014

Cost to Backfill a Trenchzip code   feet 
ItemQuantityLow  High  
Trench Labor
Direct labor expenses to backfill trench.
3.0 hours$138.39$159.75

Totals - Cost to Backfill Trench
 
25 feet$138.39$159.75
 
 
Average cost
per linear foot
$5.54$6.39

Cost to Backfill a Trench - 2014 Cost Calculator

The cost to Backfill a Trench averages $5.54 - $6.39 per linear foot in 2014. This Trench Backfilling cost estimate is calculated from average material costs, unit labor producitivity rates and national average hourly labor wages. To refine the estimate for your Trench Backfilling project:

1. Set Project Location Enter the location is where labor is hired and materials purchased.

2. Specify Project Size Enter the number of "feet" required for the project.

3. Re-calculate Click the "Update" button.

Trench Backfilling - Average Cost Per Linear Foot

Expect to pay in the high end of the $5.54 - $6.39 per linear foot range for a licensed, bonded and insured contractor and for complex or rush projects. Hire carefully, only after verifying prior work quality.

For the best value on Trench Backfilling: combine related projects; get bids from several pros; and be flexible about project scheduling.

Cost to Backfill a Trench - Notes and General Information

The cost estimate includes:

The cost estimate does not include:

Cost to Backfill a Trench - References



homewyse | smart home decisions
Products & Services